Troubleshoot and test Arctic Spas with melted heater pump plug

Page of 32 Go. We recommend an electrical subpanel containing a 50 amp GFCI breaker is used to supply power and. This subpanel requires a 50 amp, two pole, single phase, volt, four wire service. The grounding conductor must be at least the same gauge as the. A qualified electrician must install the electrical circuit. This hot tub must be permanently connected hard-wired to the power supply. Supplying power to the hot tub, which is not in accordance with these instructions, will void both.

Then open the door to the control. Install the cable with appropriate connector through the large opening provided in the side of the. Connect wires, color to color, on terminal blocks TB1. All wires must be.

Arctic spa electrical hookup

Table of Contents Add to my manuals Add. This manual also for: Show all Fox Tundra Yukon Frontier. Comments to this Manuals Your Name: Enter text from picture: By pressing 'print' button you will print only current page.

To print the manual completely, please, download it. Don't show me this message again. Got it, continue to print. Wiring a hot tub should only be done by a certified electrician.

This is required by law in the United States and Canada. Every Arctic Spas dealership can refer you to an electrician who has experience wiring hot tubs. Here is an illustrated example of a typical hot tub electrical installation.

This is strictly for reference only; wiring a hot tub should be completed by a certified electrician.

Electrical Installation Instructions

Most of our hot tubs require a 50 amp ground fault protected circuit breaker, but there are other options. The amperage draw of each model varies by specification, input voltage, and components in use. Contact a us or a dealer near you for more information. These steps must be followed to properly start-up or refill your spa: Ensure the electrical connections have been made in accordance with the manual. Ensure all O-Rings have been installed into unions and unions have been tightened sufficiently.

Ensure all ball valves are open, and the drain has been closed. Once the spa is filled to the proper level, turn the power to the spa on by turning on the GFCI breaker in your panel. Watch the display on the topside control.

After power-up, the display will blink until a key is pressed. This feature is to let you know that there was a power outage.

Troubleshoot and test Arctic Spas with melted heater pump plug

The jet pump, heating system and all internal plumbing will achieve a partial prime as the spa is filled. Once the jet system is fully operational as indicated by strong, non-surging jets , priming of the spa is complete. Weak or surging jets are an indication of a low water level condition or clogged filter cartridges.

Make sure you secure the cover in place using the cover locks. Periodically check the spa water temperature. How long before I can use my new spa? Do I need a crane? Do I need to help deliver my hot tub? Your dealer will probably be willing to do a site inspection to ensure a trouble-free delivery.

You need a level surface. Was this the way that wiring access was supposed to be gained to the inside of the cabinet? If not, how was it supposed to have been done?